Enel Grids is looking for collaboration partners to provide an innovative approach that will respect biodiversity when developing new assets (installation of overhead electrical lines and/or substations).
We are engaged in a very challenging project that concerns the impact minimization of electric assets. These include overhead lines (high voltage and medium voltage, often with bare conductors) and substations crossing urban/rural/forest areas. The general framework is the No Net Biodiversity Loss approach: this is in order to estimate the effect on biodiversity and to promote its protection during the installation of electric infrastructure. The aim is to restore the areas involved and to offset the residual impacts, so that no loss remains. Our goal is to collect ideas/methodologies for minimizing the effect on biodiversity in the construction of the new asset and to optimize the offsetting in terms of land occupancy and economic effort.
This Challenge contributes to the following Sustainable Development Goals:
• SDG 7, 9, 13, 15
– Register now to start solving this Challenge! The full description Challenge will be available to logged in users only. –
For questions about the Challenge and your proposal you can contact [email protected]
Explain your proposal clearly in English, attach documents (max 5 files, 25MB total size) if needed.
This is an electronic Request-for-Partners (eRFP) Challenge; the Solver will need to submit a written proposal to be evaluated by the Seeker with a goal of establishing a collaborative partnership.
Awards:- Collaboration with Enel
Deadline:- 28-08-2022